OUR PROJECTS
Client: Texland Petroleum
Projects:
- Lubbock Edmission Unit Waterflood System
- NE Smyer Unit Waterflood System
- Heath-Stallings Unit Waterflood System
- Idalou Unit Waterflood System
Client: Great Plains Water Supply Corporation
Projects:
Design of water gathering and distribution system
Client: Targa Resources
Projects:
- Middle Eunice Compressor Station
- North Eunice Compressor Station
- Brinninstool Compressor Station
Client: Apache Corp
Projects:
Central Battery and Satellite Facility Construction and Installation
- Compressor Installation
Client: Concho Resources
Projects:
- Several SWD’s Throughout New Mexico and Texas
- Design Tank Batteries, Design Booster Stations
Client: Hoover Energy/Caprock II
Projects:
- Oil Gathering Pipeline
- LACT unit Station
- Tank Battery Design and Construction
- Stampede Oil Terminal Station
Client: Seawolf
Projects:
- 16” and 12” HDPE Production Waterline
- Bruin SWD
- Mallard SWD
- RedHead SWD
- Diver Duck Central Tank
Client: Diamond Back / Endeavor
Projects:
- Flexsteel Flowline Installations
- Upgrade Central Batteries
- Construction New Central Batteries
- Numerous 10”-30” HDPE poly lines Installations
Client: Unocal Corporation
Projects:
- Parker H&P Injection Station
- Parker Phase II Waterflood
- Perkins Unit Improvement
- Southwest Andrews Unit Improvements
- Keystone Gas Storage Unit Installation
- Keystone-Transwestern Meter Installation
Client: Texas Independent Energy, Inc.
Projects:
- EPC for the Odessa – Ector Power Plant Pipeline Installations, including
- 20” Water Supply Lines
- Reuse Water Line
- Fire Water/Potable Water Line
- Process Waste Discharge Line
- Sanitary Sewer Line
- Water Booster Stations
- Compressor Facilities
- 24” and 16” Natural Gas Lines
- Gas Meter Station
- Whitewater Pipeline Interconnect